Our Work

Forty years of foundations, finishes, and the crew that ties them together. Built to endure.

Before & After

Two transformations from the JEGC bath portfolio. Drag the slider to compare.

Water-damaged bathroom corner showing rotted wood framing, disintegrated wall tile, and exposed cabinet anchor — extensive structural damage uncovered. Finished bathroom with white tile, black-and-grey mosaic accent band, shaker vanity with chrome faucet, and glass-enclosed shower with basket-weave floor. Before After

Discovery of severe water damage exposes rotted framing and disintegrated tile in a corner where a vanity once stood. The finished bathroom restores the space with a black-and-white mosaic accent band, a white shaker vanity with chrome fixtures, marble-look porcelain floor tile, and a glass-enclosed shower. Wreckage to retreat.

Two JE-GC workers in branded shirts demolishing dated tile around a cast-iron bathtub, exposed wall adhesive and rubble across the floor. Completed residential bathroom with white subway-tile tub surround, soaking tub, oil-rubbed bronze fixtures, and white plank-tile floor. Before After

JE-GC crew gut-demolishes a dated tub surround in November — exposed walls, debris, branded crew shirts. Three months later, the same room reveals a clean white subway-tile tub surround with a brushed-bronze fixture, fresh tile flooring, and staged towels. From condemned to completed.

Project Stories

How the work came together — by site, by year.

South Florida · 2015

Commercial interior — full crew, full season

A South Florida commercial interior built out 2015. The finished result speaks to JEGC's craft — neutral, durable materials selected for the long haul. Crew shots show the work as it happened, not styled afterward.

Travertine-and-running-bond-stone outdoor fireplace surround with glass fire-media insert.
Crew member in orange vest and white hard hat reviewing a CMU-and-plywood structural opening.
Wide panoramic view of a large commercial CMU shell with scaffolding throughout.
South Florida · 2017

Interior build-out — drywall to feature wall

Multi-trade interior build-out where drywall finishing was the pacing item. Crew shots capture the active install, finished by a custom brick-and-wood horizontal-shelf feature wall in the lower-level corridor.

JEGC-branded crew member smooth-coats fresh drywall in a long interior renovation room.
Crew member in white je-gc branded uniform installs drywall panels next to plans pinned to wall.
Custom brick-and-wood horizontal-shelf feature wall in a residential lower-level corridor.
South Miami / Pinecrest · 2018

Bathroom remodel — frameless glass + porcelain

A South Miami / Pinecrest bathroom remodel built around a frameless-glass walk-in shower with neutral porcelain tile, an integrated tub deck, and a curbless mosaic shower-floor variant — neutral, durable materials selected for the long haul.

Frameless-glass walk-in shower with neutral porcelain tile, integrated tub deck, and folded towels.
Large-format porcelain tile floor and shower wall meet a deep soaker tub; chrome shower control trim.
Curbless shower entry with mosaic floor tile, center drain, and flush threshold to large-format adjacent tile.
South Miami / Pinecrest · 2019

Bathroom remodel — granite + espresso

A 2019 South Miami / Pinecrest bath remodel anchored on a long espresso vanity with a white-and-grey speckled granite top, brushed-nickel single-hole faucet, and a dark wood-framed mirror. Plank-tile floor carries through to the bedroom beyond.

Finished primary bath: speckled granite top on espresso flat-panel vanity, undermount square sink.
Long espresso vanity with white-and-grey granite top and dark wood-framed mirror, plank tile floor.
South Miami / Pinecrest · 2020

Steel-railing fabrication — site-bent, site-finished

A 2020 South Miami / Pinecrest steel-railing fabrication run end-to-end on site: pipe-diameter verification, dry-fit at the concrete stair, anchor and weld, then a finished black-painted handrail with a looped bottom return.

Installer test-fits a custom-bent steel pipe handrail extension at the base of an exterior concrete stair.
New black steel handrail anchored to concrete stair, with cut-and-bent extension landing prepared for welding.
Finished black-painted steel handrail with looped bottom return securely wall-mounted at exterior concrete steps.
South Miami / Pinecrest · 2021

Balcony restoration + ADA shower

A 2021 South Miami / Pinecrest project pairing a condo-balcony restoration with an ADA-compliant primary bathroom: classical balustrade re-set over a fresh waterproofing membrane, aluminum slider system, and inside, a compact ADA shower with a marble curb and brushed-nickel grab bar.

Newly waterproofed condo balcony with grey membrane, classical balustrade, and aluminum sliding-door system installed.
Restored condo terrace with classical balustrade, sliding-door wall, and wall-mounted TV — Mediterranean courtyard view.
Compact ADA shower with white square tile, frameless glass partition, marble curb, brushed-nickel grab bar.
South Florida · 2021

Commercial interior — pool amenity + corridor

A 2021 South Florida commercial interior covering both finished resort amenity (stacked-stone pool water feature) and the connecting corridor — grey-blue feature wall, brass-and-glass sconces, plank floor.

Hotel-style pool with stacked-stone water-feature wall and sun loungers behind.
Sliding-glass-door track set into a finished condo unit overlooking palms and a Mediterranean building beyond.
Finished elevator vestibule with grey-blue feature wall, brass-and-glass sconces, plank floor.
Fort Lauderdale · 2022

Impact-glass install — slider to finish

A 2022 Fort Lauderdale impact-glass slider install: two-person crew aligning and sealing the bottom track on a condo balcony, and the finished floor-to-ceiling slider with edge-fin detail visible against a Mediterranean courtyard view.

Two-person crew aligns and seals the bottom track of a tall impact slider on a condo balcony.
Tall floor-to-ceiling impact-rated sliding glass door installed at condo balcony.
Layered glazing detail of a tall impact-rated slider, edge fins visible, condo terrace beyond.
South Miami / Pinecrest · 2024

Hardscape — driveway apron repair

2024 South Miami / Pinecrest hardscape: a sunken paver-and-concrete driveway apron diagnosed pre-renovation, sequenced with traffic cones during the patch, and finished by a five-person crew washing the new pavers in.

Damaged paver-and-concrete driveway apron with sunken section at a residential entry, yellow curb behind.
Paver patch in progress with traffic cones marking work zone, mismatched temporary pavers indicate sequenced repair.
Five-person crew with squeegees and brooms washes new pavers after install on a Coral Gables residential drive.
Coral Gables · 2025

Bathroom remodel — travertine tile + leveling clips

A 2025 Coral Gables bathroom remodel where travertine-look porcelain tile was set with orange leveling clips to keep the long shower walls dead-flat. The finished frameless-glass walk-in pairs travertine walls, mosaic floor, and a brushed-nickel grab bar.

Travertine-look porcelain tile shower with brushed-nickel grab bar and corner shelf, mosaic floor visible.
Frameless-glass walk-in shower with travertine-look porcelain walls, mosaic floor, and brushed-nickel hardware.
Travertine-look porcelain tile installed with orange leveling clips on shower walls, mosaic floor laid, ready for grout.
Coral Gables · 2025

Bathroom remodel — French door + teal accent

A 2025 Coral Gables primary-bath project where the design moves were a full-height French exterior door, a dark teal subway accent wall, and a white hex-tile floor. Frameless glass partitions the office area beyond the bath.

Bathroom with full-height French exterior door, stucco walls, dark teal subway accent, and white hex floor.
Frameless glass partition with stainless push-pull hardware separates a finished office area with art and dark plank floor.

Ready to Start Your Project?

Get a free, detailed estimate from our team. No obligation.